Our works

course thumb

Sholapur

Design work of 90 km four laning of Pune Sholapur Highway

course thumb

Maharastra

Design work of four laning of Khed - Sinnar Section of NH50 from KM 42+000 to KM 177+000 under NHDP Phase - IV in the state of Maharastra.

course thumb

Maharastra

Consultancy services for the preparation of feasibility and DPR for preparation for Bridge and structural inventory of Road of Murtizapur - Kherda SH 282.

course thumb

Maharastra

Design work of four laning of Dhule - Fangne - Tarsud Maharastra - Gujrat border Section of NH8 under NHDP Phase - IV DBFOT basis.

course thumb

Maharashtra

Development of roads where bypasses are provided, in Towns/villages on NH-211 (New-NH-52) & Naldurg, Omerga on NH-09 (New-NH-65) on EPC Mode.

All Proejcts

Completed Projects

# Project Name Name of Client/Employers Type of services rendered Project Length
1

Consultants for preparing the Detailed Project Report (DPR) of the stretches / corridor of Package 9 (NH-53 Badnera Road - Nagzari Kharda road section from Belora Kherda Karanja Mangrulpir SH 280 and SH 274 and Murtizapur to Kherda SH 282 excluding Badnera Nagzari) for up gradation to Two Lane paved shoulder / Four Lane configuration in the state of Maharashtra

Pentacle Consultant (I) Pvt Ltd.

DPR (Detailed Project Report)

16.11 KM Approx

2

Quality control, Earthwork quantity, Cross section design, and development of “Four laning of Fagne to Gujarat-Maharashtra Border section of NH 6 from Km 510 to Km 650.79 in Maharashtra under NHDP Phase IV.” On Design-Build-Finance-Operate-Transfer (DBFOT).

GHV (India) Pvt Ltd

Design

141.59 KM

3

Four Laning of Khed-Sinnar Section of NH-50 from Km 42+000 to Km 177+000 (Design Length - 137.946 Km) under NHDP Phase IV in the state of Maharashtra on DBFOT Basis

IL&FS Transportation Network Limited

Design

100 KM

4

Four Laning of Amravati- Chikhli section of NH-6 [Package-1 from km 166.000 (Amravati) to km 220.000 (Near Kurankhed)] in the state of Maharashtra

Skylark

Design

54 KM

5

Amravati- Chikhli section of NH-6 [Package-II from km 220.000 (Near Kurankhed) to km 270.000 (Near Shelad)] in the state of Maharashtra

BCCPIL

Design

40 KM

6

Widening of existing road from Km 144.400 to Km 249.000 on the Pune Solapur Section of NH-9.

L&FS Transportation Network Limited

Design

105 KM

7

Development of existing roads where bypasses are provided, in towns/village (Ule,Suratgaon,Malumbra,TuIjapur,Shingoli & Yedshi) On NH-211 (New-NH-52) & Naldurg,Omarga on NH-09 ,(New NH-65) In the State of Maharashtra on EPC Mode

M/s Anant Chaitanya Consultancy Services

Pavment Design

5 KM

Ongoing Projects

# Project Name Name of Client/Employers Type of services rendered Project Length
1

Consultancy Services for Feasibility study and preparation of Detail Project Report (DPR) for improvement and up-gradation of newly declared National Highways including existing Ghazipur-Jamaniaya-Saiyad Raja road of NH-97 in the State of Uttar Pradesh.

NHAI

DPR (Detailed Project Report)

48 KM

2

Project PN-36 "Imrovements to Mahabaleshwar Satara Rahimatpur Pusesawali Vita Road, SH - 140. Km 0/000 to 131/600. Dist. Satara (Part I Mahabaleshwar to Dhamner Km 0/000 to Km 72/360 excluding overlap length of flyover 0.58 Km) (Project No.PN-36). for 2-Laning with Paved Shoulder Road in the state of Maharashtra under MRIP on Hybrid Annuity Mode.

Roadway Solution India Infra Ltd

Project Management Consultancy Services (Supervision)

71.78 KM

3

Project No. PN-26: Improvements to Roads in Industrial Sector in Pune District Hinjewadi. Chakan, Talegaon, Ranjangaon, Jejuri & Add. Jejuri) (Part I-Pirangut Ghotawade Man Hinjewadi Marunji Kasarsai Urs Road Km 0/00 to Km 36/630. Pashan Sus Nande Lavale road Km6/400 to Km 18/174, Mhalunge Nande Chande Mulkhed Ghotawade Km 0/000 to Km 11/956) in the state of Maharashtra under MRIP on Hybrid Annuity Mode.

Roadway Solution India Infra Ltd

Project Management Consultancy Services (Supervision)

58.36 KM

4

Project PN-25: Improvement of roads connecting the tourist destination in Pune District (Panshet, Lonavala, Rajmachi. Torna, Sinhgad, Purandar) (i) Khanapur to Panshet Km 0+000 to Km 16+470, (ii) Donje Kundanpur Khed Shivapur Km 7+500 to km 18+865, (iii) Saswad to Kapurhol km 54+500 to km 74+490. (iv) Mahad Madheghat Cheladi road SH-106 Km 29+400 to km 30+725 and (v) SH-106 to Torna Fort road VRI Km 0+000 to 2+110. For 2 laning with paved shoulder road in the state of Maharashtra under MRIP on Hybrid Annuity Mode.

Roadway Solution India Infra Ltd

Project Management Consultancy Services (Supervision)

51.18 KM

5

Project PN-52: Improvements to Malharpeth- Umbraj- Masur- Mayani - Diganchi -Mahud Pandharpur Road S.H.143 (Km 55/000 to 107/000 Dist. Satara & Sangli & Km 107/000 to 153/420 Dist. Solapur) ( Part-Ii Dighanchi to Pandharpur Km 107/000 to km 153/420) (Proposed length km 107/000 to km 153/420) in the state of Maharashtra under MRIP on Hybrid Annuity Mode

Roadway Solution India Infra Ltd

Project Management Consultancy Services (Supervision)

46.08 KM

6

Project No. PN-24 : Improvement to (A) Paud Kolvan Lonavala Road, MDR 26, Km 16/400 to 41/300, Tal. Maval, Dist. Punc. (Part- Km 16/400 to Km 41/300), (B) MDR 26 to Javan Shilimb Morve Ghusalkhamb to SH 110 Road. Km 0/000 to 20/500, Tal. Maval, Dist. Pune (Part- Km 0/000 to Km 19/080), (C) Khadakwasala Donje Khanapur Ranjane Pabe to SH 106 Road, SH 133 Tal-Velhe, Dist-Pune, km 14/200 to 45/500 (Part- Km 13/800 to Km 44/920 & Khadakwasla Diversion Km 0/000 to 1/060) for for 2-Lanning with Paved Shoulder Road in the state of Maharashtra under MRIP on Hybrid Annuity Mode.

Roadway Solution India Infra Ltd

Project Management Consultancy Services (Supervision)

71.16 KM

7

Design and Construction of Standalone 6 laned VUP at Purmpada (Km.282.322) on Dhule- Pimpalgaon (Km 265- Km.380) section of NH-03 (New NH-60) in the state of Maharashtra on EPC Mode.

Interbuild Infrastructure PVt LTd

Project Management Consultancy Services (Supervision)

1.15 Km VUP at Km 282/322 with 2.00 Km service road

8

Design and Construction of Standalone 6 laned VUP at Purmpada (Km.282.322) on Dhule- Pimpalgaon (Km 265- Km.380) section of NH-03 (New NH-60) in the state of Maharashtra on EPC Mode.

Interbuild Infrastructure PVt LTd

Proof Checking Consultancy Services)

1.15 Km VUP at Km 282/322 with 2.00 Km service road

9

Balance Work under Phase -II for 4 laning of Khed Sinner Section of NH-50 (New NH-60) Comprising of the Stretches of Kalamb Bypass (km 68.576 to km 72.390), Linear length of Bhatkalwadi (km 89.550 to km 90.400) and Alephata bypass (km 92.030 to km 96.000) (Total length- 8.634 Km) of Pune District in the State of Maharashtra on Engineering, Procurement & Construction (EPC) Mode.

V M Matere Infrastructure (I) Pvt Ltd

Safety Consultant

8.634 KM

10

Construction of Balance work under Phase-I for 4 laning of Khed Sinner Section of NH-50 (New NH-60) comprising of the stretches Khed Bypass (km 42.000 to km 46.981), Peth (km 56.100 to km 56.780), Manchar bypass and linear length of Eklahre from km 60.100 to km 68.576 (Total Length -14.137 km) of Pune District in the State of Maharashtra on EPC Mode

T&T Infra Ltd.

Project Management Consultancy Services (Drawing, Supervision)

14.137 KM

11

Construction of Eight lane access-controlled Expressway from Km 154.600 to Km 190.000 of Vadodara Mumbai Expressway (Jujuwa to Gandeva Section) in the State of Gujarat on Hybrid Annuity Mode under Bharatmala Pariyojana (Phase I-Package VIII)

Interbuild Infrastructure PVt LTd

Project Management Consultancy Services

35.400 KM

12

Construction of Eight lane access-controlled Expressway from km 128.000 to km 154.600 of Vadodara Mumbai Expressway (Karvad to Jujuwa section) in the state of Gujarat on Hybrid Annuity mode under Bharatmala Pariyojna (Phase I-Package IX)

Interbuild Infrastructure PVt LTd

Project Management Consultancy Services

26.60 KM

13

Construction of Eight lane access-controlled Expressway from Km 103.400 to Km 128.000 of Vadodara Mumbai Expressway (Talasari to Karvad Section) in the State of Gujarat, UT of DNH and Maharashtra on Hybrid Annuity Mode under Bharatmala Pariyojana (Phase I-Package X).

Interbuild Infrastructure PVt LTd

Project Management Consultancy Services

24.600 KM